Tag Archives: Electrical Services

Green Energy – from ElectricalConnection.org

New Ways To Save Energy Never Get Old! 13 Tips from the Electrical Connection!

It Pays To Hire Union – from ElectricalConnection.org

Customers have wide array of companies to choose from when they select an electrical contractor.  Please consider this article when doing so as Schaeffer Electric is extremely proud of its affiliation with the IBEW..

Complete – Mechanical Dynamics & Analysis High-Speed Balance Facility

See our new portfolio entry.

Complete – Washington University Mallinckrodt New Chiller & Switchgear

See our new portfolio entry.

MD&A Turbine-Generator Repair Facility Addition – Project Update

Site electric and building underground work is progressing at MD&A in South St. Louis.  With such a small footprint, significant coordination has taken place to allow all the trades to meet schedule.  Thank you to all the trades and the design team for recognizing the proximity issues and keeping themselves and their coworkers safe.

MD&A  MD&A  MD&A  MD&A MD&A

President’s Message

Wow!  Has this year flown by!

As I begin my second year as President, I am thankful for so much and wanted to share a few thoughts as Schaeffer Electric continues to move forward.

We are now already two months in to our Fiscal Year 2013, and we’re off to a great start. Shortly, Schaeffer will begin work on a ‘spin cell’ which balances high speed turbines – one of only a few in the world. It’s unique to say the least, and we look forward to working with MD&A and Tarlton in building the facility. Vital projects for Mercy, Webster University, Elantas and others are ongoing.

Read More…

Saint Louis University – Pius Library Renovations

Renovations were recently completed on the Saint Louis University – Pius Library.  Performed direct for Saint Louis University and in conjunction with their maintenance personnel along with personnel from ICS Construction, the project consisted of five floors of design assist power and lighting modifications.  Spline ceilings for all five floors were completely removed and replaced allowing for new lighting throughout.  In additional, all branch panels on the five floors were replaced along with a motor control center in the basement.  The entire project was completed in a five month schedule while the library was open to the public.

Metro Link – Substation 10 Wire Rehabilitation Project

Work is nearly complete for the Metro Substation 10 Wire Rehabilitation Project.  Schaeffer and Collins & Hermann safely and successfully installed approximately 5000′ of 4″ FRE and 7000′ of 750 MCM cable up the steep slope from the substation to the tracks for the Metrolink project.

St. Louis Community College – Fan Installation

Schaeffer Electric recently completed two Big Ass Fan installations for St. Louis Community College.  In addition to the fans, Schaeffer’s electricians installed structural steel and mesh to support and protect the fan.

Metro Link – Light Rail Expansion Fiber Network

Schaeffer Electric performed all the low voltage work along seven miles of new track with ten new stations.  Work in the stations included electrical work supporting the low voltage systems. Wiring and device hookups were performed for the following systems: SCADA, voice, data, fire alarm, CCTV, radio antennas, and ticketing just to name a few. All the fiber optic cables were brought into each station spliced and connectorized. Active fiber splice cases were accessed with the new stations being spliced in on two hour time frames.